Where can I find @RISK for Project in v8?
The link between @RISK for Excel and Microsoft Project schedules that was offered in previous versions of @RISK is not included in @RISK 8.0. This means that Monte Carlo simulation of Microsoft Project schedules is not available in @RISK 8.0. However, cost risk analysis and schedules built in Excel can still be simulated as always. Palisade is actively evaluating how to best integrate leading-edge schedule risk analysis going forward. Please note, you may install both @RISK 7.x and @RISK 8.0 on the same machine (although they cannot be run simultaneously). This enables you to keep performing schedule risk analysis in Microsoft Project using an older version of @RISK, which Palisade will continue to support.